Project Experience:


Jacksonville/Baldwin Railtrail, Duval County, FDOT District 2

This District Two Enhancement Project consisted of converting an existing abandoned railroad bed into an equestrian/bicycle trail. The project is approximately 16 miles in length and meanders through existing wetlands. The project contains several major creek crossing which involved the preparation of Location Hydraulic Reports (LHR). Ian is serving as design engineer for this District Two Enhancement Project and will be responsible for preparation of the LHR. Ian provided the project engineer with the technical support needed to assure the preparation of the contract plans.

SR 200, Marion County, FDOT District 5

Ian assisted the project engineer during this project located in the City of Ocala. The project was 1.98 kilometers in length. It consisted of design of sidewalk along an existing urban commercial corridor. Included in the design were sidewalks, upgrading to ADA standards, signing and striping including special emphasis markings, traffic control, and utility adjustments.

Adams Street (SR 363), Leon County, FDOT District 3

Ian assisted the Project Manager in the development of construction plans which consisted of resurfacing and milling of roadway, constructing paved shoulders, reworking roadside ditches, and extending non-functional cross-drains and side-drains.

Ross Road (SR 363), Leon County, FDOT District 3

Ian assisted the project engineer in the development of the construction plans for this project. He was also instrumental in quantity computations using the automated computations capability of Geopak.

SR 363/ Oak Ridge Road, Leon County, FDOT District 3


Ian’s involvement in this project consisted of annotating the plan and profile sheets, cross sections, including adding utilities, and signing and pavement marking sheets, design, quantity computations, and utilities.

Capital Circle, Leon County, FDOT District 3

Ian was involved in the design of the signs and pavement markings for this project. He also prepared quantity computations, cross sections, and a proposed drainage technical report.

SR 295, Escambia County, FDOT District 3

This project consists of milling, resurfacing, patching existing concrete slabs, filling joints, placing a crack relief membrane, and raising the existing curbing. Ian provided support to the project manager in the preparation of plan and profile sheets, typical sections and adding utilities to the profiles, and cross sections.

SR 30, Escambia County, FDOT District 3


This project consists of the addition of two-lanes eastbound to the existing two-lanes westbound in Pensacola, Florida. The existing two-lane section will be milled and resurfaced. Stormwater treatment facilities were required to provide for treatment of the additional impervious areas. Ian assisted the project engineer in the production of the construction plans, including plan and profile setup, typical sections, traffic control plans, utility adjustments, and signing and pavement marking plans.

SR 207, St. Augustine, FDOT District 2

Ian assisted the project engineer in various aspects of this project including plans production and updating. This project was an 8.0 kilometer urban roadway project. The project involved the upgrading of a two-lane rural roadway to a four-lane (future six-lane) urban roadway.

US 441 Bridge Rehab., Alachua County, FDOT District 2

This project consists of replacing the existing bridge with a longer and higher structure to meet flood hydrology requirements. The approaches to the bridge are being reconfigured and special consideration given to the environmental concerns due to the pristine nature of the river. Ian provided support to the project manager in the design and layout of the drainage structures as well as the preparation of plan and profile sheets, typical sections and adding utilities to the profiles, and cross sections.

Mill Creek Bridge Rehab., Putnam County, FDOT District 2

This project consists of the rehabilitation of a historic bridge that was built in 1916 by the Luten Bridge Company. A new superstructure is being placed within the existing substructure. This involves removing the existing deck of asphalt concrete, limerock and brick deck and replacing it with a new deck slab. The new slab will rest on new pier shafts and endbent backwalls constructed on existing foundation footings. Ian is the co-project manager working along side Lisa Ray.

US 301 / SR 200, Alachua County, FDOT District 2

This District Two 3R project consisted of widening for the addition of a paved shoulder and resurfacing. Other improvements included closing and relocating median openings, widening of medians within the urban area of Hawthorne, and removal of existing on-street parking. The length of the project was 18.144 miles. Ian provided support to the project manager in the preparation of plan and profile sheets, utility vertical verifications throughout the plans, preparation of signing and marking plans, and earthwork calculations.